The following presents
an overview of recent projects :
2007
Optimus Process
Consultants (Operator :Merlon Petroleum)
o
Specification of all field instruments for new onshore development in
Egypt
2006/7 BP
o Package
management
o Investigative
studies, Statement of Requirements for metering and compressor
modifications at Dimlington Terminal
o
Cleeton
Turbine/Compressor Controls Upgrade Study
o
Ravenspurn North
Compression Optimisation Support
o
West Sole Alpha Generator Commissioning Procedures and Certification
Package Preparation
2006
April - Shell
o
Functional Safety Assessments
2006 Jan
- Maersk Oil Global Producer 3
o
Detail
Design Studies
2006 Jan
BP Project Management of Subsea Mechanical - Hot Tap Project
o
Feed
Study
2005 Dec
Maersk Oil
o
Dumbarton
Project Detail Design Studies
2005 Oct
- BG Maria FEED
o
Subea
tieback back SIL assessment and hardware verification
2005
August - BG Maria Conceptual
o
Subea
tieback back SIL assessment
2005 RWE
nPower Aberthaw B Power Station
o
Responsible for producing corporate Safety Instrumented System Hazard
Risk & Assessment Procedure
2005 RWE
nPower Aberthaw B Power Station
o
Functional Safety Assessment using LOPA technique
2005
Montgomery Watson (Consultants)
o
1 day
course on requirements of IEC61508
2009
Association with 4 Sight Consulting
o
IEC61511
2 day combined workshop and presentation to cross industry sector.
o
2002 BP
Hutton Project West Sole
2003/4 BP
Sullom Voe Terminal
o
Responsible for the SIS architecture review, detail design and factory
acceptance testing of the new ESD and Fire & Gas systems for the new
reception facilities for the Clair platform at Sullom Voe.
o
SIL
Assessment of new subsea tieback
2002 BP
Ravenspurn South
o
Variety
of SIL Assessments for condensate modifications
2002 BP
Dimlington Terminal
o
Control
System Design for merging the BP Easington Terminal controls into
Dimlington
o
Control
System design associated with replacement of obsolete ESD and F&G
systems